Dormer Update
_______________________________________________ November 23, 2008
![]() All the new drain and vent pipes in the floor after our plumbing inspection. ![]() The new plumbing and wiring in the wall where the sink and toilet will go. ![]() Looking into the bathroom after we installed the subfloor, insulation, and bathtub. ![]() Brooke working on taking off the old shingles so we could blend in the new ones. ![]() Brooke's parents came over one day to give us some extra hands while we were working on the roofing. Here are Brooke and Walt working on laying shingles on the dormer roof. ![]() Finishing off the lower part of the roof. The roof had two layers of shingles, but we only removed the top layer in some areas, and had to match the double thickness in the areas where we had taken it all off. ![]() Done with the roofing below the dormer, up both sides, and one side of the dormer roof. Just need to finish the far side of the dormer roof, and the ridge on the main roof. |